Total construction time 15 days or 30 hours. Pleasant and fitting kits, I followed the coloring of the manual. The bands should be green instead of red as the central radar screen. I chose red.
The instruments, the decals were in very good condition despite the age of the kit, were covered with several drops of shiny gloss at intervals for the glass effect.
I used Gunze colors while winsor and newton varnishes.

Build – text: Dimitris Moulakis
Translation: Antony Galenianos

Comments

  1. Hello Mr Moulakis. I would be the most grateful if you could send me a scanned copy of the Italeri 1/12 F-104G Starfighter instruction manual, since I would like to detail my Modelex (Heller) 1/72 F-104G/TF -104G Starfighter cockpit. Thanks in advance, Lionel Paz.

Leave a Reply

Your email address will not be published. Required fields are marked *